

Insights
Insights
-
No result found
by OZGUR O.
- Posted: 5 Oct 2025
-
No result found
by Michael G.
- Posted: 17 Jul 2025
by KINETICAI INC
- Posted: 1 Jul 2025
by Amah L.
- Posted: 6 Jun 2025
-
Amah L.
Stockton-on-Tees, GBCould do better on a normal work ethics, but skips details as a leverage aiming to raise cost variation. Tricky though!
Abdul K.
The project was delivered with all agreed components, including full code (with 4 major review rounds), visualizations, and CSV files. However, the client changed the requirements multiple times without providing consistent technical clarity, which impacted scope and direction. Even the client does not understand technically about the project.
Despite these shifts, I maintained professionalism and addressed every new request without asking for an additional cost, with the additional cost charged only for the new scope. The comment about cost leverage is unfair and does not reflect the work ethic or transparency I upheld throughout. I'm always open to revisions when the scope is clear and stable. -
by Lee J.
- Posted: 12 Mar 2025
by Buck Y.
- Posted: 7 Mar 2025
by Chris A.
- Posted: 15 Oct 2024
by Si C.
- Posted: 26 Sep 2024
by Daria R.
- Posted: 23 Sep 2024
-
Daria R.
Limassol, CYExcellent communication, timely delivery and overall, great work! Highly recommend Abdul K.
Abdul K.
Thank you so much, Daria! It was a pleasure working with you as well. I’m glad you were satisfied with the work and communication. Looking forward to any future collaborations!
Best regards,
Dr. Abdul Karim