Architectural Support for Live Project
- or -
Post a project like this- Posted:
- Proposals: 3
- Remote
- #1969998
- Expired
Description
We require the support of an experienced architect with an on-going project. The project is now in the implementation phase, and has started on site, however there are a few outstanding design related aspects to finalise.
The development comprises of a 8 units (flats - 1,2 and 3 bedrooms) apartment block, timber frame with external brick cladding.
Project Location: St Leonards on Sea, Hastings.
The role will suit ideally someone with experience in design co-ordination and residential design.
At the moment we will require support in the following areas:
Discharging planning conditions - basic conditions, approx. 5 no. conditions. Includes liaison with Council.
Reviewing and re-issuing drainage design. Co-ordination of proposals with requirements from Southern Water in regards with new connections
Plumbing and water calculations to include in service connection requests
Co-ordination of M&E design - review of current proposal and producing first fix designs and service routes, or facilitating the sourcing of designs. To include the required sprinkler system.
We are looking for a fixed price for the above scope, remote working will also be considered, however we would like someone that can and is willing to visit the site.
Below link to download pdf drawings.
https://www.dropbox.com/s/f31so3e0kjzeqns/CW-175-Building%20Regs%20Issue-1.pdf?dl=
Wyle D.
93% (12)New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
Could you provide copy of the current M&E design you wish to be reviewed. By reference to sprinkler system, we take it that is the "dry riser", or is there a sprinkler system required also (only normally requirement under Welsh Building Regulations currently, not England), or is it a Employer's Requirement for insurance purposes or similar.
Sorry for so many questions, wish to provide the best quotation possible. Thanks.Wyle D.11 Apr 2018Would be easier to discuss this with our project manager Mihai Leustean. You can contact him on details below.
office@westshoregroup.co.uk
07754 992081
What is your travelling rate? Could you also let me have your details.
Regards,
Wyle -
Drainage design that requires review, are you able to send a copy or is it something yet to be undertaken.
Wyle D.11 Apr 2018Yet to be done.
-
Will you require us to liaise and obtain material samples, as per Planning Condition No. 3, or will others be obtaining these and our role be just to prepare the schedules/paperwork needed and submit.
Wyle D.11 Apr 2018Prepare the schedules/paperwork needed and submit only.
-
Do you require a Build Over Agreement with the Water Authority for sewers in proximity, building over, or normally within 6 metres. Planning Condition No. 5 seems to suggest there may be.
Wyle D.11 Apr 2018Speak to our PM on this. His details in another message.
-
Do you have a construction programme or guide to project duration, and how many Design Team meetings or meetings on site would you envisage or like us to allow, if any. A lot of work can be done via phone and email, so may not be necessary after say an initial meeting on site to familiarise, but you would be best to advise on your expectation, style of management.
Wyle D.11 Apr 2018We are not looking for you to do any site meetings at this point.
-
Just trying to get a better understanding of your requirements. Would you be wanting us to act as the CDM Principal Designer for the project as well, or have you already engaged a consultant to undertake on your behalf, as its a Statutory obligation to have one appointed early on in the project. Thanks.
Wyle D.11 Apr 2018Already appointed.
-
Would you like the drainage optimised so as to save on depth of dig, and amount of pipework used.
Wyle D.10 Apr 2018Hi again,
Yes that would be helpful. Below is a link to existing drainage survey, might find this useful.
https://www.dropbox.com/sh/ylmn1zc05kv8kmu/AABvVxyhoCmesCYK0JcjJ8yMa?dl=0
Regards,
WyleDESIGN COORDINATION10 Apr 2018Thanks. Reviewed. Appears to be drain condition survey only. Do you know the Cover Level and Invert levels of the various manholes in proximity of the site.
Does a land survey or topo exist? -
Do you have a copy of the Planning Decision Notice so we can evaluate. Thanks.
Wyle D.10 Apr 2018Below link for the Planning Decision
https://www.dropbox.com/s/npi4dtxguohwgr8/PLANNING%20APPROVAL-53838.pdf?dl=0
Regards,
Wyle