Animated Explainer Video for Fire Mist System Installation
- or -
Post a project like this82
£250(approx. $313)
- Posted:
- Proposals: 32
- Remote
- #4142285
- OPPORTUNITY
- Awarded
Experienced Team of Graphic Designers, Web Developers, Content Writers and Digital Marketing Specialists
Sheffield
Expert in illustration and Photoshop , Animator, video editor, web design / developer / data scrapping expert
Karachi
Expert in Video editing | Animation | CV Update | illustrations | Photoshop | CGI and AutoCAD expert | Web developer & designer | Expert in Data scrapping
Karachi
67067591623752774334301554938021373859416571127966703907313894102241241021884610134627
Description
Experience Level: Expert
We are seeking a talented animator/videographer to create an engaging animated explainer video for our Fire Mist System installation process. The video will consist of two main parts: '1st fix' and '2nd fix'. Below is a detailed description of each part:
1st Fix:
- Showcase the company vehicle arriving at the property.
- Illustrate engineers walking in with hard hats and hi-vis vests, meeting the occupant/builder.
- Display the installation of black pipework from either the cupboard under the stairs or the utility cupboard, up into the ceiling, and then to the spray head positions within the open-plan area.
- Depict the pressure testing of installed pipework by filling it with water and pumping up to the desired pressure using a pressure tester to ensure no leaks.
- Conclude by showing the occupant/builder signing the engineer's tablet to indicate satisfaction.
Video Transition:
Show a sped-up section of the same property, with a calendar displaying days clicking by, while builders complete plasterboarding, plastering, and 2nd fix plumbing and electrical work. Once the other building work is completed, the occupant/builder will call the company office to initiate the 2nd fix.
2nd Fix:
- Illustrate the company vehicle arriving at the property for the 2nd fix.
- Show engineers walking in with hard hats and hi-vis vests.
- Display the installation of the Halo2 orange pump into the cupboard.
- Demonstrate the connection to mains water using a lever valve.
Illustrate the connection to electricity through a rotary isolator.
Connect the pipework end from the 1st fix to the orange Halo2 pump.
- Fill water through pipework and place a sticker on the front, with engineers filling out details on the tablet.
- Conclude by showing the occupant/builder signing the engineer's tablet to indicate satisfaction.
We invite experienced animators/videographers to bid on this project. Please include samples of your previous work and a brief description of your approach to creating engaging animated explainer videos.
The ideal candidate will have a keen eye for detail, creativity, and the ability to bring our Fire Mist System installation process to life through animation.
1st Fix:
- Showcase the company vehicle arriving at the property.
- Illustrate engineers walking in with hard hats and hi-vis vests, meeting the occupant/builder.
- Display the installation of black pipework from either the cupboard under the stairs or the utility cupboard, up into the ceiling, and then to the spray head positions within the open-plan area.
- Depict the pressure testing of installed pipework by filling it with water and pumping up to the desired pressure using a pressure tester to ensure no leaks.
- Conclude by showing the occupant/builder signing the engineer's tablet to indicate satisfaction.
Video Transition:
Show a sped-up section of the same property, with a calendar displaying days clicking by, while builders complete plasterboarding, plastering, and 2nd fix plumbing and electrical work. Once the other building work is completed, the occupant/builder will call the company office to initiate the 2nd fix.
2nd Fix:
- Illustrate the company vehicle arriving at the property for the 2nd fix.
- Show engineers walking in with hard hats and hi-vis vests.
- Display the installation of the Halo2 orange pump into the cupboard.
- Demonstrate the connection to mains water using a lever valve.
Illustrate the connection to electricity through a rotary isolator.
Connect the pipework end from the 1st fix to the orange Halo2 pump.
- Fill water through pipework and place a sticker on the front, with engineers filling out details on the tablet.
- Conclude by showing the occupant/builder signing the engineer's tablet to indicate satisfaction.
We invite experienced animators/videographers to bid on this project. Please include samples of your previous work and a brief description of your approach to creating engaging animated explainer videos.
The ideal candidate will have a keen eye for detail, creativity, and the ability to bring our Fire Mist System installation process to life through animation.
Thomas L.
100% (22)Projects Completed
11
Freelancers worked with
11
Projects awarded
67%
Last project
24 Apr 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies