M&E consultant

  • Posted
  • Proposals 1
  • Remote
  • #19923
  • Archived
Kevin W. has already sent a proposal.
  • 1

Description

Experience Level: Intermediate
We need someone to co-ordinate and over see the M&E requirements. Most of the below will probarbly be dealt with by sub contractors.

- SAP calcs
- Part L compliance for electric space heaters
- Service hole size in riser cupboards
- Ceiling void depth Study room, Shower room, Kitchen, Communal corridors
- Part L compliance will be achieved through the use of electric space heaters
- Any space required for plant in the basement or roof void
- Sprinkler requirements
- CCTV spec
- Performance spec for M&E items/requirement
- Service specifications and drawings for all the sevices

If you have any questions please contact through the clarification board.

Thanks

Clarification Board

    There are no clarification messages.