Description
Experience Level: Intermediate
Estimated project duration: 1 - 2 weeks
A Chartered Civil/Structural Engineer to complete the safety checks for an 'Application for special and temporary buildings and structures (Section 30)' for an event on the 6th June 2017, once the appropriate applicant has been selected we need the project completed in two weeks. The required calculations will be similar to the example project attached, and must cover:
- Live loads on structure
- Wind loads & overturning
- Individual component checks (buckling, horizontal loading, BM etc.)
The individual must be familiar with the following:
BS EN 12810-1:2003 (Façade scaffolds made of prefabricated components – product specifications)
BS EN 12811-1:2003 (Temporary works equipment: Scaffolds – Performance requirements and general design)
BS EN 13374:2004 (Temporary edge protection systems – Product specification, test methods
BS EN 1991-1 (Actions on structures)
BS 5973:1993 – (Access and working scaffolds and special scaffold structures in steel)
BS5975:2008 (Temporary works procedures and the permissible stress design of falsework)
Temporary demountable structures: Guidance on procurement, design and use. Third edition
The deadline for applications is on the 12th May 2017, as the structural calculations need to be completed by the 2nd June 2017. There is an opportunity for further work following this first project.
Please email sam.flaxman@alphacello.com for further information.
- Live loads on structure
- Wind loads & overturning
- Individual component checks (buckling, horizontal loading, BM etc.)
The individual must be familiar with the following:
BS EN 12810-1:2003 (Façade scaffolds made of prefabricated components – product specifications)
BS EN 12811-1:2003 (Temporary works equipment: Scaffolds – Performance requirements and general design)
BS EN 13374:2004 (Temporary edge protection systems – Product specification, test methods
BS EN 1991-1 (Actions on structures)
BS 5973:1993 – (Access and working scaffolds and special scaffold structures in steel)
BS5975:2008 (Temporary works procedures and the permissible stress design of falsework)
Temporary demountable structures: Guidance on procurement, design and use. Third edition
The deadline for applications is on the 12th May 2017, as the structural calculations need to be completed by the 2nd June 2017. There is an opportunity for further work following this first project.
Please email sam.flaxman@alphacello.com for further information.
Samuel F.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
0%
Last project
13 May 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies