Description
Experience Level: Expert
Num. of words: 2700
Industry: Technology
Topic: Civil Engineering Technology
Tone: Formal/Professional
Extensive research needed: yes
Extra notes: Need assistance with completing a report of 2700 words on Civil Engineering Technologies.
Scenario:
7 storeys hotel has been designed in 2015 in Myanmar, Mandalay. You are working as a civil engineering project manager for a company based in the Myanmar, Mandalay area. The directors have asked you to oversee the planning approval, land purchase, site investigation and site preparation, design, construction, of a development for the project. The work, which your company is responsible for, is the construction of a new hotel which will have accommodation for 200 guests. The client requires the cheapest solution for the given project with the following details to keep excavation, fabrication and assembly costs to a minimum. According to the architectural details, two basements are going to be created with total height of 5 m. Note that, in addition to 5m excavation under the hotel, the land need to be cut to provide a flat surface to create green area and parkings (Fig. 2). Furthermore :
There are 12 trees with diameter of around 430 mm on the site
The soil can be classified as clay with slope stability of 43 degree
The ground water level is 5 meters under ground level
The mat foundation is used
The site plan, structural geometry and cross section of the land are given in Fig 1, 2, and 3. As you are a site engineer, you are required to carry out
Earthwork activities i.e. the most suitable equipment, numbers, and time of operation of each
Suitable methods and techniques used to create substructures
Suitable methods and techniques used to create superstructure
Identify the hazards associated with civil engineering activities.
(For more detail see Submission and presentation section)
In preparation for the work to start, you have been asked to produce a report on the methods and resources that you can use in the above project.
It is expected to provide a creative solution for all above activities and the use of sustainable methods that will enhance the functionality and operations
Industry: Technology
Topic: Civil Engineering Technology
Tone: Formal/Professional
Extensive research needed: yes
Extra notes: Need assistance with completing a report of 2700 words on Civil Engineering Technologies.
Scenario:
7 storeys hotel has been designed in 2015 in Myanmar, Mandalay. You are working as a civil engineering project manager for a company based in the Myanmar, Mandalay area. The directors have asked you to oversee the planning approval, land purchase, site investigation and site preparation, design, construction, of a development for the project. The work, which your company is responsible for, is the construction of a new hotel which will have accommodation for 200 guests. The client requires the cheapest solution for the given project with the following details to keep excavation, fabrication and assembly costs to a minimum. According to the architectural details, two basements are going to be created with total height of 5 m. Note that, in addition to 5m excavation under the hotel, the land need to be cut to provide a flat surface to create green area and parkings (Fig. 2). Furthermore :
There are 12 trees with diameter of around 430 mm on the site
The soil can be classified as clay with slope stability of 43 degree
The ground water level is 5 meters under ground level
The mat foundation is used
The site plan, structural geometry and cross section of the land are given in Fig 1, 2, and 3. As you are a site engineer, you are required to carry out
Earthwork activities i.e. the most suitable equipment, numbers, and time of operation of each
Suitable methods and techniques used to create substructures
Suitable methods and techniques used to create superstructure
Identify the hazards associated with civil engineering activities.
(For more detail see Submission and presentation section)
In preparation for the work to start, you have been asked to produce a report on the methods and resources that you can use in the above project.
It is expected to provide a creative solution for all above activities and the use of sustainable methods that will enhance the functionality and operations
Hashim G.
100% (47)Projects Completed
45
Freelancers worked with
25
Projects awarded
53%
Last project
9 May 2019
United Arab Emirates
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
Looks like only candidates with a background in civil engineering will be able complete this, based on what I've gathered from reading the description.
395982
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies