
Dedicated Linux Server Health Check, Upgrade Advice & Migration
- or -
Post a project like this29
£250(approx. $338)
- Posted:
- Proposals: 28
- Remote
- #4492763
- OPPORTUNITY
- Open for Proposals
Website Developer || Mobile App Developer || Website Designer || Ai Developer || Software Engineer

React Native|React|Node|APi | dashboard| Laravel | Go high Level | Flutter, SEO, PPC | Ai Automation|Webflow|Shopify|CRM|App|Zoho|


⭐⭐⭐⭐⭐Top Rated Website developer || Mobile Application Dev || Website Designer || Ai Automation Expert
Full-Stack Web Developer | Web Systems Engineer | Modern Workspace Specialist | Trainer

1190046312876072132533671325318412947158239221888597713414902112740355041591188218710214442
Description
Experience Level: Expert
Project Overview:
I am looking for an experienced Linux server specialist to review the health and setup of our current dedicated server with Fasthosts and advise whether we should proceed with an upgrade and migration.
We currently run 3 live websites on a dedicated Ubuntu 20.04 server via Plesk. The server has 32GB RAM. A recent backup failure flagged a RAM issue where the system removed the snapshot during the backup process. No further alerts have come through since, but it has raised concerns about overall capacity and stability.
Fasthosts have recommended either optimisation or upgrading.
Proposed Upgrade (from Fasthosts):
• Server: E3-1270-64-HDD
• RAM: 64GB
• OS option: Ubuntu 24.04 with Plesk
What I Need From You:
Phase 1 – Server Health Check & Review
• Review current server setup (Ubuntu 20.04, Plesk Obsidian)
• Check RAM usage, CPU, disk, services, and general performance
• Review backup configuration and failure cause
• Identify any inefficiencies or risks
• Confirm whether upgrade is genuinely required or if optimisation would suffice
Phase 2 – Upgrade Recommendation
• Provide a clear recommendation:
Stay and optimise OR
Upgrade and migrate
• If upgrading, confirm whether the proposed Fasthosts server is suitable
Important Constraint:
We must remain on PHP 8.2.30.
No PHP upgrades to be carried out as part of this work due to compatibility with existing code.
Phase 3 – Migration (if approved)
• Full migration of 3 websites to new server
• Maintain Plesk structure and configurations
• Ensure:
Minimal downtime
All services tested post-migration
Backups working correctly
Key Requirements:
• Strong experience with:
Linux (Ubuntu)
Plesk
Fasthosts / similar environments
Server migrations
Backup systems (Acronis or similar)
• Must work carefully with live production sites
• Clear communication and sensible approach
Pricing:
I require a fixed price for:
1. Health check and recommendation
2. Migration if needed
Additional Notes:
• Current issue appears linked to RAM during backups, but system otherwise looks stable
• Storage is nearing capacity on backup system
I am looking for an experienced Linux server specialist to review the health and setup of our current dedicated server with Fasthosts and advise whether we should proceed with an upgrade and migration.
We currently run 3 live websites on a dedicated Ubuntu 20.04 server via Plesk. The server has 32GB RAM. A recent backup failure flagged a RAM issue where the system removed the snapshot during the backup process. No further alerts have come through since, but it has raised concerns about overall capacity and stability.
Fasthosts have recommended either optimisation or upgrading.
Proposed Upgrade (from Fasthosts):
• Server: E3-1270-64-HDD
• RAM: 64GB
• OS option: Ubuntu 24.04 with Plesk
What I Need From You:
Phase 1 – Server Health Check & Review
• Review current server setup (Ubuntu 20.04, Plesk Obsidian)
• Check RAM usage, CPU, disk, services, and general performance
• Review backup configuration and failure cause
• Identify any inefficiencies or risks
• Confirm whether upgrade is genuinely required or if optimisation would suffice
Phase 2 – Upgrade Recommendation
• Provide a clear recommendation:
Stay and optimise OR
Upgrade and migrate
• If upgrading, confirm whether the proposed Fasthosts server is suitable
Important Constraint:
We must remain on PHP 8.2.30.
No PHP upgrades to be carried out as part of this work due to compatibility with existing code.
Phase 3 – Migration (if approved)
• Full migration of 3 websites to new server
• Maintain Plesk structure and configurations
• Ensure:
Minimal downtime
All services tested post-migration
Backups working correctly
Key Requirements:
• Strong experience with:
Linux (Ubuntu)
Plesk
Fasthosts / similar environments
Server migrations
Backup systems (Acronis or similar)
• Must work carefully with live production sites
• Clear communication and sensible approach
Pricing:
I require a fixed price for:
1. Health check and recommendation
2. Migration if needed
Additional Notes:
• Current issue appears linked to RAM during backups, but system otherwise looks stable
• Storage is nearing capacity on backup system
Projects Completed
196
Freelancers worked with
149
Projects awarded
51%
Last project
9 Apr 2026
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-

Martin, what exact process is running at the moment the backup fails, specifically which services or tasks spike RAM and disk usage during that window?
1153648
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies