HVAC Calculation – Create Thermal Load calculation for Existing Project
- or -
Post a project like this$200
- Posted:
- Proposals: 5
- Remote
- #2086058
- Expired
Description
Experience Level: Expert
Required Professional HVAC Engineer to work on an existing project
Requirements:
1- Create the thermal load calculation for each spaces and zone according to existing Drawings.
2-Work on Program HAP E-20 version 4.9
3- Match the final thermal loads calculation for Each AHU & FCU with the existing equipment Schedules.
4- Car Park Ventilation Calculation should be calculated according to existing Exhaust schedules and according to codes.
5- Check the output of air quantities for each space on the drawings.
6 - Exhaust ventilation for toilet and kitchen is required according to existing Exhaust schedules and according to Ashrea requirements.
7- Riser diagram for chilled water pipe is required according to the schedule and drawings.
8-Cooling Tower calculation is required with according to schedules.
7- The pressure loss of a pipes and ducts system is required.
Important instructions for accomplishing the task:
1- It is not allowed to change the data in the equipment schedules.
2- Do not allow the extension of the specified time period.
3- Use the data that will be agreed upon.
4- Do not allow changing the air outlets location and the dimensions of the air ducts and also apply to chilled water pipes.
Requirements:
1- Create the thermal load calculation for each spaces and zone according to existing Drawings.
2-Work on Program HAP E-20 version 4.9
3- Match the final thermal loads calculation for Each AHU & FCU with the existing equipment Schedules.
4- Car Park Ventilation Calculation should be calculated according to existing Exhaust schedules and according to codes.
5- Check the output of air quantities for each space on the drawings.
6 - Exhaust ventilation for toilet and kitchen is required according to existing Exhaust schedules and according to Ashrea requirements.
7- Riser diagram for chilled water pipe is required according to the schedule and drawings.
8-Cooling Tower calculation is required with according to schedules.
7- The pressure loss of a pipes and ducts system is required.
Important instructions for accomplishing the task:
1- It is not allowed to change the data in the equipment schedules.
2- Do not allow the extension of the specified time period.
3- Use the data that will be agreed upon.
4- Do not allow changing the air outlets location and the dimensions of the air ducts and also apply to chilled water pipes.
Mohamed H.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
0%
Last project
6 May 2024
Egypt
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies