ETAP Protection Study
- or -
Post a project like this$$$
- Posted:
- Proposals: 3
- Remote
- #2049472
- Expired
Description
Experience Level: Expert
Estimated project duration: 3 - 4 weeks
I am looking for a qualified Electrical Engineer to undertake a Protection Study using ETAP software. Must be able to produce the following:
1. Details of the Site intake 11kV Protection settings ( this is to include the G59/4 protection settings on each of the incomer CB’s)
2. The protection study should take the form of a report document including fault study and details of fault contribution from embedded generation.
2. Confirmation of the operational configuration for a primary 11kV switchboard, (i.e. closed bus or open bus).
3. Confirmation of the details for the embedded generation power outputs (minimum and maximum) for potential export to grid.
4. Transient stability study show generation responses to short term grid outages and voltage recovery profiles for such events.
5. Network Load Flow model depicting MW and MVAr flows at grid minimum and maximum voltage limits
6. G54 study
7. P28 study to demonstrate voltage dip compliance during site transformers energisation inrush period (this needs to be considered for gross site transformer provisions).
Applicants MUST have their own access to this software and be able to produce the required deliverables.
All sensible bids considered.
1. Details of the Site intake 11kV Protection settings ( this is to include the G59/4 protection settings on each of the incomer CB’s)
2. The protection study should take the form of a report document including fault study and details of fault contribution from embedded generation.
2. Confirmation of the operational configuration for a primary 11kV switchboard, (i.e. closed bus or open bus).
3. Confirmation of the details for the embedded generation power outputs (minimum and maximum) for potential export to grid.
4. Transient stability study show generation responses to short term grid outages and voltage recovery profiles for such events.
5. Network Load Flow model depicting MW and MVAr flows at grid minimum and maximum voltage limits
6. G54 study
7. P28 study to demonstrate voltage dip compliance during site transformers energisation inrush period (this needs to be considered for gross site transformer provisions).
Applicants MUST have their own access to this software and be able to produce the required deliverables.
All sensible bids considered.
Euan S.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
0%
Last project
5 May 2024
Spain
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies