Description
Experience Level: Expert
Project Overview:
We require a professional electrical design for a commercial shop fit-out in Walton-on-Thames, UK. The design must comply with BS7671:2018+A2:2022.
A full CAD drawing will be provided with all zones, circuits, and equipment clearly plotted and identified. Your job will be to carry out the technical design and calculations based on this information.
Scope of Work:
• Load calculations based on provided appliance and equipment schedule (e.g. 3-phase coffee machines, fridges, tills, lighting).
• Cable sizing (including voltage drop, grouping, and installation conditions).
• Circuit design and protective device specification (MCB/RCD/RCBO).
• Distribution board schedule.
• Earthing and bonding per BS7671.
• Annotated layout showing cable routes and circuit numbers (you can build off the provided CAD).
Circuit Requirements:
• Multiple radial socket circuits
• Two lighting circuits
• Each 3-phase outlet on its own individual circuit
Files Provided:
• CAD floor plan (with zones, devices, and boundary already mapped)
• Equipment/power schedule
Deliverables:
• PDF with full electrical design and circuit layout
• DWG/DXF CAD output with annotated circuits
• Load schedule and distribution board schedule
• Cable and protection specifications
Timeline:
• Preferred turnaround: 3–5 working days
We require a professional electrical design for a commercial shop fit-out in Walton-on-Thames, UK. The design must comply with BS7671:2018+A2:2022.
A full CAD drawing will be provided with all zones, circuits, and equipment clearly plotted and identified. Your job will be to carry out the technical design and calculations based on this information.
Scope of Work:
• Load calculations based on provided appliance and equipment schedule (e.g. 3-phase coffee machines, fridges, tills, lighting).
• Cable sizing (including voltage drop, grouping, and installation conditions).
• Circuit design and protective device specification (MCB/RCD/RCBO).
• Distribution board schedule.
• Earthing and bonding per BS7671.
• Annotated layout showing cable routes and circuit numbers (you can build off the provided CAD).
Circuit Requirements:
• Multiple radial socket circuits
• Two lighting circuits
• Each 3-phase outlet on its own individual circuit
Files Provided:
• CAD floor plan (with zones, devices, and boundary already mapped)
• Equipment/power schedule
Deliverables:
• PDF with full electrical design and circuit layout
• DWG/DXF CAD output with annotated circuits
• Load schedule and distribution board schedule
• Cable and protection specifications
Timeline:
• Preferred turnaround: 3–5 working days
Robert S.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
0%
Last project
24 Oct 2025
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies