
Technical specification for Battery Energy Storage System
- or -
Post a project like this$60
- Posted:
- Proposals: 12
- Remote
- #4287119
- Expired
MEP |Lighting | DIALux I Electrical I MATLAB I Solar|PCB I Firmware |Embedded
Strategic Infrastructure, Construction, and Energy Consultant | Renewable Energy & Utilities Specialist
10852840835974911833063636651582691511824307440862117009211185482211470051186544311878228
Description
Experience Level: Entry
Estimated project duration: less than 1 week
I am looking for experienced electrical engineer to prepare a detailed technical specification document for a Battery Energy Storage System (BESS) using the CSI master format to ensure optimal design, performance, and integration with PV power and engine generator as a micro grid system.
The technical specification document should provide a clear framework for designing, deploying, and operating the BESS, ensuring that it satisfies performance objectives and regulatory requirements.
Technical requirements:
Battery Type: Specify the Type of battery, capacity (MWh), and voltage levels.
System Architecture: Outline the system architecture and sequence of operation.
Safety Measures: Provide specific safety measures for thermal management, overcharge/discharge prevention, fire suppression, and fault detection.
Performance Objectives: Define the performance objectives of the BESS, including energy storage capacity, power output, and efficiency.
Integration with PV Power and Engine Generator: Outline the integration of the BESS with PV power and engine generator as a micro grid system.
Testing and Commissioning: Specify the testing and commissioning procedures for the BESS, including performance testing, safety testing, and system integration testing.
Qualifications:
The electrical engineer should have a proven record of experience in designing and implementing BESS systems.
He should be familiar with the CSI master format and have experience in designing and implementing micro grid systems.
They should have a strong understanding of electrical engineering principles, including power systems, control systems, and renewable energy systems.
The technical specification document should provide a clear framework for designing, deploying, and operating the BESS, ensuring that it satisfies performance objectives and regulatory requirements.
Technical requirements:
Battery Type: Specify the Type of battery, capacity (MWh), and voltage levels.
System Architecture: Outline the system architecture and sequence of operation.
Safety Measures: Provide specific safety measures for thermal management, overcharge/discharge prevention, fire suppression, and fault detection.
Performance Objectives: Define the performance objectives of the BESS, including energy storage capacity, power output, and efficiency.
Integration with PV Power and Engine Generator: Outline the integration of the BESS with PV power and engine generator as a micro grid system.
Testing and Commissioning: Specify the testing and commissioning procedures for the BESS, including performance testing, safety testing, and system integration testing.
Qualifications:
The electrical engineer should have a proven record of experience in designing and implementing BESS systems.
He should be familiar with the CSI master format and have experience in designing and implementing micro grid systems.
They should have a strong understanding of electrical engineering principles, including power systems, control systems, and renewable energy systems.
Benjamin L.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
0%
Last project
4 Feb 2026
Egypt
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies

