Description
Experience Level: Entry
Need a Conveyance analysis done and check on mitigation report done. Nothing major this job could take a day to complete. the plans have already been done, the mitigation is complete just need small changes to wording.
so besides the conveyance analysis the changes that need to be made are attached. I want to explain that if you look at the Mitigation plan to the right in the Elevation resume where you see based Flood Elevation that needs to be changed to Designated Flood Elevation and the numbers are incorrect it should be 54.14 so if you can do the conveyance analysis and the changes from the comments thats is want is needed Thanks
FYI:
You didn't submit a conveyance analysis. your 500—year DFE or WSEL is all over the place. the information differs and not uniform to match on all sheets.
On sheets A-03, A-04, A-05, and A-06, a lone with the site plan, clear call out the natural average adjacent grade, 500-year DFE or WSEL, and the finished floor - FF or lowest floor LL elevation. Ensure the 500-year flood elevation was referenced form FEMA FIS Profile.
FYI: - all information must be uniformed to match-
Note:
Ensure that all plumbing and electrical is elevated up to the minimum flood protection which is up to the BOO-year water surface elevation level - WSEL plus 2 additional FT of freeboard.
Floodplain Management Date FMO
Review Completed Date: June 21, 2024
100-year base flood elevation BFE is to be retrieved from FEMA FIS Profile
52-78
SOD-year water surface elevation level WSEL or designated flood elevation — DFE is to be retrieved from the F IS
Profile 54.14
- Based on the given 500-year water surface elevation level - WSEL, the information given on the site-plan sheet differs from the information in the FIS-
so besides the conveyance analysis the changes that need to be made are attached. I want to explain that if you look at the Mitigation plan to the right in the Elevation resume where you see based Flood Elevation that needs to be changed to Designated Flood Elevation and the numbers are incorrect it should be 54.14 so if you can do the conveyance analysis and the changes from the comments thats is want is needed Thanks
FYI:
You didn't submit a conveyance analysis. your 500—year DFE or WSEL is all over the place. the information differs and not uniform to match on all sheets.
On sheets A-03, A-04, A-05, and A-06, a lone with the site plan, clear call out the natural average adjacent grade, 500-year DFE or WSEL, and the finished floor - FF or lowest floor LL elevation. Ensure the 500-year flood elevation was referenced form FEMA FIS Profile.
FYI: - all information must be uniformed to match-
Note:
Ensure that all plumbing and electrical is elevated up to the minimum flood protection which is up to the BOO-year water surface elevation level - WSEL plus 2 additional FT of freeboard.
Floodplain Management Date FMO
Review Completed Date: June 21, 2024
100-year base flood elevation BFE is to be retrieved from FEMA FIS Profile
52-78
SOD-year water surface elevation level WSEL or designated flood elevation — DFE is to be retrieved from the F IS
Profile 54.14
- Based on the given 500-year water surface elevation level - WSEL, the information given on the site-plan sheet differs from the information in the FIS-

Ken T.
100% (2)Projects Completed
3
Freelancers worked with
2
Projects awarded
7%
Last project
3 Nov 2024
Argentina
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies