Construction Environmental Management Plan & Demolition Plan
- or -
Post a project like this1410
£100(approx. $125)
- Posted:
- Proposals: 4
- Remote
- #2864896
- Awarded
Description
Experience Level: Expert
Estimated project duration: 1 day or less
****(URGENT, Required to be completed within 24 Hours Maximum) ****
Attached is the Construction Environmental Management Plan for reference.
This document did not contain enough information to discharge condition 3. As you can see it is fairly comprehensive but lacks the information only a contractor can provide.
The attached PDF shows the councils response to our CEMP and as you can see they require detailed information on noise & vibration etc. before the condition can be discharged, and no works can commence on the demolition phase until this is approved in writing by the council.
I have attached the original planning permission in which you can see the information that is required to discharge condition 3, along with needed CEMP and demolition plan with piling method statement.
Attached is the Construction Environmental Management Plan for reference.
This document did not contain enough information to discharge condition 3. As you can see it is fairly comprehensive but lacks the information only a contractor can provide.
The attached PDF shows the councils response to our CEMP and as you can see they require detailed information on noise & vibration etc. before the condition can be discharged, and no works can commence on the demolition phase until this is approved in writing by the council.
I have attached the original planning permission in which you can see the information that is required to discharge condition 3, along with needed CEMP and demolition plan with piling method statement.
Roger L.
100% (12)Projects Completed
17
Freelancers worked with
16
Projects awarded
15%
Last project
7 Mar 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
Roger - do you have an engineer and contractor for the project as information may e required from them ? also not sure if the CEMP as submitted was included. Also can you confirm if there is any flexibility in the timeline? Ken Hegsons.com
Roger L.03 Jun 2020Hi Ken, The CEMP is on the proposal now. We are the contractor and the engineers are on the project who we can liase with.
-
Roger - is the Schedule of Works the document that has been submitted to discharge the CEMP Condition ? Do you have a structural engineer (piling arrangement designed) and contract on board for the project ? Ken. Hegsons.com
923350923345
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies