
Connection of the wind farm to the transmission network
- or -
Post a project like this1583
€100(approx. $115)
- Posted:
- Proposals: 3
- Remote
- #3437673
- Awarded
Description
Experience Level: Intermediate
ELECTRICAL ENGINEERS ONLY
You've to make a project report on "Connection of the wind farm to the transmission network"
No simulation or algorithms required. Just Electrical calculations based on the formulas given.
•Task
1) Select generation source/sources based on power
2) Establish technical indicators of generation sources (active, reactive power, voltage, etc.)
3) Selection of conductors and transformers. According to the corrected power of generation sources and the type of connection specified in the task, select the connection scheme of the generating sources, devices (power transformers, etc.), determine their parameters, losses of reactive power.
4) Calculate the reactive power generated by the line/lines according to the line type and length specified in the task.
5) Calculate the reactive load and voltage at the end of the power line to minimise the loss of active power on the line
Further details will be given after you accept the project.
You've to make a project report on "Connection of the wind farm to the transmission network"
No simulation or algorithms required. Just Electrical calculations based on the formulas given.
•Task
1) Select generation source/sources based on power
2) Establish technical indicators of generation sources (active, reactive power, voltage, etc.)
3) Selection of conductors and transformers. According to the corrected power of generation sources and the type of connection specified in the task, select the connection scheme of the generating sources, devices (power transformers, etc.), determine their parameters, losses of reactive power.
4) Calculate the reactive power generated by the line/lines according to the line type and length specified in the task.
5) Calculate the reactive load and voltage at the end of the power line to minimise the loss of active power on the line
Further details will be given after you accept the project.
Aurimas N.
100% (1)Projects Completed
1
Freelancers worked with
1
Projects awarded
100%
Last project
25 Nov 2021
Lithuania
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies