
Google Sheets Script Creator
- or -
Post a project like this3957
£150(approx. $206)
- Posted:
- Proposals: 3
- Remote
- #705067
- Awarded
Description
Experience Level: Expert
General information for the website: Google sheet for attendance
Description of requirements/features: We use a good sheet for attendance in a small club and I want to “jazz it up” a bit.
Here is a link to the current sheet https://docs.google.com/spreadsheets/d/114yU-9qOIDq-Fq9Numckzk8IANNsi_Cao91ipucZuTk/edit?usp=sharing
Here is what I want
- Is it possible to get the sheet name from the setup file e.g if I change in the setup sheet the same of the group then that sheet also renames itself (Maybe like this ? https://productforums.google.com/forum/#!topic/docs/DzexKVCOWQs )
- Is it possible to Either A) Hide the old days from users who are member of an email group OR have a look at the tab called Copy of Group 1, could we make it so that when users enter data in here it pushes it through to the group 1 sheet for the correct day?
If you click group 1 and scroll all the way to end I want the Emergency, Sick, medical etc… To count only 1 if it is entered in a day E.G If on the 02/02/2015 a student misses 5 lessons with code E E E E E E (6 lessons) then it should say at the end count as 1 instead of currently 6
Is it possible for when a student reaches the 1st, 2nd and no exam warning (set on the setup sheet) that a person is emailed say say “STUDENT XXXXX has reached the 1st warning””
Extra notes:
Description of requirements/features: We use a good sheet for attendance in a small club and I want to “jazz it up” a bit.
Here is a link to the current sheet https://docs.google.com/spreadsheets/d/114yU-9qOIDq-Fq9Numckzk8IANNsi_Cao91ipucZuTk/edit?usp=sharing
Here is what I want
- Is it possible to get the sheet name from the setup file e.g if I change in the setup sheet the same of the group then that sheet also renames itself (Maybe like this ? https://productforums.google.com/forum/#!topic/docs/DzexKVCOWQs )
- Is it possible to Either A) Hide the old days from users who are member of an email group OR have a look at the tab called Copy of Group 1, could we make it so that when users enter data in here it pushes it through to the group 1 sheet for the correct day?
If you click group 1 and scroll all the way to end I want the Emergency, Sick, medical etc… To count only 1 if it is entered in a day E.G If on the 02/02/2015 a student misses 5 lessons with code E E E E E E (6 lessons) then it should say at the end count as 1 instead of currently 6
Is it possible for when a student reaches the 1st, 2nd and no exam warning (set on the setup sheet) that a person is emailed say say “STUDENT XXXXX has reached the 1st warning””
Extra notes:
Lewis H.
100% (136)Projects Completed
107
Freelancers worked with
94
Projects awarded
68%
Last project
1 Sep 2023
United Arab Emirates
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies