
Java Application for Heating and Cooling Load for a House
5547
£200(approx. $267)
- Posted:
- Proposals: 6
- Remote
- #50247
- Archived
Description
Experience Level: Expert
You will calculate the heating and cooling loads for a typical residence. The wintertime
heating load is all of the heat that flows out of the building when the outside temperature is
nearly its coldest and when there is no free heat provided by sunshine or internal lights or
appliances. The coldest time is typically in the middle of January. The summertime cooling
load is all of the heat that flows into the building when the outside temperature is nearly its
hottest, the outside humidity is high, there are no clouds to block the sun, and the building is
occupied with normal lighting and appliance usage. The hottest time is usually about 3:00
PM at the end of July.
Assume that four design parameters are constant: The winter indoor design temperature is
72°F, the summer indoor design temperature is 76°F, the summer indoor design humidity
ratio is 0.01 lbs of water vapour per pound of dry air, and the sunshine coming in through
west windows at the design time is 193 BTU/hr / ft2, this is the value at 3:00 PM on July 21.
heating load is all of the heat that flows out of the building when the outside temperature is
nearly its coldest and when there is no free heat provided by sunshine or internal lights or
appliances. The coldest time is typically in the middle of January. The summertime cooling
load is all of the heat that flows into the building when the outside temperature is nearly its
hottest, the outside humidity is high, there are no clouds to block the sun, and the building is
occupied with normal lighting and appliance usage. The hottest time is usually about 3:00
PM at the end of July.
Assume that four design parameters are constant: The winter indoor design temperature is
72°F, the summer indoor design temperature is 76°F, the summer indoor design humidity
ratio is 0.01 lbs of water vapour per pound of dry air, and the sunshine coming in through
west windows at the design time is 193 BTU/hr / ft2, this is the value at 3:00 PM on July 21.
Dev P.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
0%
Last project
9 Mar 2026
India
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies