Build a three-point dashboard fed by 3 spreadsheets (2 external)
- or -
Post a project like this391
£60(approx. $75)
- Posted:
- Proposals: 11
- Remote
- #3878735
- Awarded
Data Modeling in Excel & Power BI With Power Pivot, Power Query, DAX and Google Data Studio Expert.
Dhaka
Creative Hacking | Marketing Management | Funnel Building | Traffic Tracking | Campaigns Optimization | Automation | GOOGLE EXPERT
Dubai
Experienced Graphics designer |Experienced WordPress Full Stack|SharePoint Expert|Data Entry Team |flyer/business card/Brochure||2DAnimation||Photoshop work|
Islamabad
|BPR|Research|Marketing|Translations|Design|Technical Support|Assistance|more... much more...
Quilmes
WordPress Expert/Woocommerce Expert/Data Scientist/Python Expert/Auto-CAD/3D/2D Animation/ White Board Animation
Rawalpindi
Data Consultant (Expert in Excel, VBA/Macros, Google Sheets, Fillable Pdf services, Data Entry)
Zwota
19467142105103231792823598252454441315100555831127026817835974987226738914301
Description
Experience Level: Entry
I am trying to build a three-point dashboard fed by 3 spreadsheets (2 external).
I would like to RAW MATERIAL STOCK file to supply data to feed columns I and J of the "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet. I have tried doing this with a Vlookup but it does not like me. If the item is in-stock "column I" should show the stock amount. for the components (green highlight) If in stock, the about should also show in Column I.
I would like the Blue cells of the "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet to be filled by totalling the instances of each item. The green highlighted components should auto-calculate. I initially thought it should be a Vlookup + sumif + importrange but that is not working for me.
For the dashboards, I have added in the headers I would like.
For what we can make,
I want the sheet to show what item codes are in stock and ready to go in Dark green - this will be fed from "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet (column G of the blue highlights). for items where we have enough components ( green highlights ("Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out", columnA) I would like them to show in Pale green. If we do not have enough stock, I would like it to show in the Amber and Red part of the dashboard.
Amber & Red
I would like any missing componentry to show in this dashboard. I would like it Colour coded to show products missing 1-2 components in orange and items missing more in red.
Bulk Formula
In "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet i have added the formulas about the ingredients that make them up, Is it possible to scan the sheet and have it continuously calculate any formulas below safety stock level ( shown "Raw Material Sheet" column AQ) and add them to the dashboard in pale green? Again any formulas that cannot be made would be shown in the Amber & Red dashboard - the Bulk one would only show orange or red depending on how many component ingredients are missing.
I hope i have explained it well, Please let me know if more is needed.
I would like to RAW MATERIAL STOCK file to supply data to feed columns I and J of the "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet. I have tried doing this with a Vlookup but it does not like me. If the item is in-stock "column I" should show the stock amount. for the components (green highlight) If in stock, the about should also show in Column I.
I would like the Blue cells of the "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet to be filled by totalling the instances of each item. The green highlighted components should auto-calculate. I initially thought it should be a Vlookup + sumif + importrange but that is not working for me.
For the dashboards, I have added in the headers I would like.
For what we can make,
I want the sheet to show what item codes are in stock and ready to go in Dark green - this will be fed from "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet (column G of the blue highlights). for items where we have enough components ( green highlights ("Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out", columnA) I would like them to show in Pale green. If we do not have enough stock, I would like it to show in the Amber and Red part of the dashboard.
Amber & Red
I would like any missing componentry to show in this dashboard. I would like it Colour coded to show products missing 1-2 components in orange and items missing more in red.
Bulk Formula
In "Copy of Production Plan Aid- 09.03.23" -"copy of Bom Pull out" Sheet i have added the formulas about the ingredients that make them up, Is it possible to scan the sheet and have it continuously calculate any formulas below safety stock level ( shown "Raw Material Sheet" column AQ) and add them to the dashboard in pale green? Again any formulas that cannot be made would be shown in the Amber & Red dashboard - the Bulk one would only show orange or red depending on how many component ingredients are missing.
I hope i have explained it well, Please let me know if more is needed.
A N.
0% (0)Projects Completed
-
Freelancers worked with
-
Projects awarded
50%
Last project
6 May 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
What is the expected timeline for the completion of the dashboard?
A N.12 Mar 2023Hi,
I was hoping for a day or two at most. Does that work? If it will take longer I will have to update the team as soon as possible.Milon H.12 Mar 2023Okay, I can do it