Foundation Design and Calculations - Dormer Bungalow
- or -
Post a project like this1120
£100(approx. $138)
- Posted:
- Proposals: 10
- Remote
- #3774437
- Awarded
5644734411110475695358075336644320674376827006177148797365735811854724
Description
Experience Level: Intermediate
Hi, I am currently working on building regulations for a new dormer bungalow and requir the following to satisy building contol;
- Foundation design and calculations (Note - BCO has requested pad foundation due to trees in vacinity of slab)
I've attached floor plan, elevations and site plan for your reference and can provide a mark up with approx location of trees and heights etc. However the main tree which is concern is a 14-16m oak tree located approx 2.5m to the left and 2m to the back of the dwelling if you are looking at it from the car parking spots.
Photos of the site can be found at - https://photos.app.goo.gl/YV6SAqNTL2NxWHPT9
Full planning application can be found at - https://pa2.harborough.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QZ7TA2HWIJA00
Please advise if you require any further infomration and advise on lead time with cost proposal, thank you.
Steve Potts
- Foundation design and calculations (Note - BCO has requested pad foundation due to trees in vacinity of slab)
I've attached floor plan, elevations and site plan for your reference and can provide a mark up with approx location of trees and heights etc. However the main tree which is concern is a 14-16m oak tree located approx 2.5m to the left and 2m to the back of the dwelling if you are looking at it from the car parking spots.
Photos of the site can be found at - https://photos.app.goo.gl/YV6SAqNTL2NxWHPT9
Full planning application can be found at - https://pa2.harborough.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QZ7TA2HWIJA00
Please advise if you require any further infomration and advise on lead time with cost proposal, thank you.
Steve Potts
Morley Design and Build Ltd
100% (2)Projects Completed
2
Freelancers worked with
2
Projects awarded
57%
Last project
28 Aug 2018
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-