Construction cost estimate: Commercial Kitchen Renovation
- or -
Post a project like this2343
$$
- Posted:
- Proposals: 3
- Remote
- #1786513
- Awarded
Description
Experience Level: Intermediate
General information for the business: Cost Estimating
Description of support work: Require detailed cost estimate for the remodel of a classroom into a commercial Kitchen.
Must have ALL aspects of construction estimated--all new equipment musty be estimated and ALL of the necessary building demolition, the new Interior finishes, all of the new Plumbing, Mechanical, and Electrical construction required to support this new equipment must be estimating.
NOTE: there are only As-built drawings, equipment list and preliminary elevations and floor plan of equipment layout. there are no Mech. plumbing or electrical drawings at this time, HOWEVER...
The estimator MUST understand, assume, and estimate the required Mech, Plumb. and Electrical fror this project. The scope to be estimated IN DETAIL IS:
All Mkechanical will be demo'd, removed and replaced with new HVAC.
All existing plumbing will be demo'd and all new plumbing, including floor sinks, must be estimated.
There is an existing 400 amp panel that will remain, all other Electrical will be removed and replaced with new electrical to support the new kitchen equipment.
Extra notes: This project requires an estimator that understands commercial kitchens and the Mech, Plumb, and Elec systems necessary to support that equipment. Make all necessary assumptions as to materials and Labor and provide DETAILED estimate broken out by labor and materials.
https://www.dropbox.com/s/mdtegxerfx67i8h/MarinaHS-bldg3A-B-as-built.pdf?dl=0
https://www.dropbox.com/s/5ys2d1velq5d3aq/Attachments622617450.zip?dl=0
https://www.dropbox.com/s/d8ygfhk9k2bbqip/Attachments622575394.zip?dl=0
Again, there are NOT Plumbing, Mechanical or Electrical drawings. This scope of work must be inferred from the kitchen layout and kitchen equipment.
Budget is flexible but project MUST be detailed and complete. Do not take on this project if you cannot complete it. I cannot pay for partial completion.
Estimated work time: 16 hours.
Deadline is end of day, Thursday, Nov. 16.
Description of support work: Require detailed cost estimate for the remodel of a classroom into a commercial Kitchen.
Must have ALL aspects of construction estimated--all new equipment musty be estimated and ALL of the necessary building demolition, the new Interior finishes, all of the new Plumbing, Mechanical, and Electrical construction required to support this new equipment must be estimating.
NOTE: there are only As-built drawings, equipment list and preliminary elevations and floor plan of equipment layout. there are no Mech. plumbing or electrical drawings at this time, HOWEVER...
The estimator MUST understand, assume, and estimate the required Mech, Plumb. and Electrical fror this project. The scope to be estimated IN DETAIL IS:
All Mkechanical will be demo'd, removed and replaced with new HVAC.
All existing plumbing will be demo'd and all new plumbing, including floor sinks, must be estimated.
There is an existing 400 amp panel that will remain, all other Electrical will be removed and replaced with new electrical to support the new kitchen equipment.
Extra notes: This project requires an estimator that understands commercial kitchens and the Mech, Plumb, and Elec systems necessary to support that equipment. Make all necessary assumptions as to materials and Labor and provide DETAILED estimate broken out by labor and materials.
https://www.dropbox.com/s/mdtegxerfx67i8h/MarinaHS-bldg3A-B-as-built.pdf?dl=0
https://www.dropbox.com/s/5ys2d1velq5d3aq/Attachments622617450.zip?dl=0
https://www.dropbox.com/s/d8ygfhk9k2bbqip/Attachments622575394.zip?dl=0
Again, there are NOT Plumbing, Mechanical or Electrical drawings. This scope of work must be inferred from the kitchen layout and kitchen equipment.
Budget is flexible but project MUST be detailed and complete. Do not take on this project if you cannot complete it. I cannot pay for partial completion.
Estimated work time: 16 hours.
Deadline is end of day, Thursday, Nov. 16.
Gerry H.
100% (83)Projects Completed
46
Freelancers worked with
30
Projects awarded
90%
Last project
4 Apr 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies