Detailed take-offs on construction docs - science
- or -
Post a project like this2140
$$$
- Posted:
- Proposals: 3
- Remote
- #2008156
- Awarded
Description
Experience Level: Expert
IMPORTANT: This project requires a DETAILED estimate be extrapolated from Schematic Design Drawings.
The estimator MUST understand construction so he can fill in the 'gaps' between what information is provided and what must be assumed.
- Require DETAILED take-offs and quantities for all materials and labor required to construction new science building as per plans provided. provide written description of all assumptions, i.e., 14 concrete footings at 4'x4'x2' per footing.
- Estimate MUST be in the format provided and follow the 16 Division, CSI format.
- Units MUST be US typical--linear feet, (fencing, railings, conduit and wiring, pipe, etc.), square feet (sheathing, concrete paving, painting, GWB, ect.), Cubic Yards (concrete, excavation: cut and fill, etc.), pounds (structural steel), Board feet (wood framing), square feet (light gauge metal framing),
- be sure to separate site work from building scope
- all quantities must be included in estimate. No lump sum costs.
- all sizes must be included (i.e., 3" conduit, #4 THHN Cu Wire, etc.)
- all door types, door sizes, frame types must be broken out separately.
- all interior partitions and exterior wall must be broken out separately.
- all window types and sizes must be broken out separately
- all finishes, accessories, and equipment must be broken out separately.
- all Mechanical equipment, ductwork, registers, etc. must be broken out separately.
- all plumbing fixtures and piping must be broken out separately.
- all electrical panels, sub-panels, conduits and wiring, lighting, switches, outlets, must be broken out separately.
- all fire alarm panels, equipment, wiring, etc. must be broken out separately
- all data and communications equipment, wiring, conduit, etc., must be broken out separately
- Again, be sure to keep all site work and building scope in separate divisions.
- All meeting notes, additions and changes must be accounted for in the estimate.
https://www.dropbox.com/s/w6vlb7govokoz06/Mira%20Loma%20SD%20Sign-off%20Doc%20180508.pdf?dl=0
https://www.dropbox.com/s/4rmh1mnh9olkmdu/MLHS_ScienceBuilding_SD%20Package%20180508r.pdf?dl=0
- PLEASE, If you are not qualified to extrapolate detailed information from a Schematic Design set of document, DO NOT BID ON THIS PROJECT!!!!!
The estimator MUST understand construction so he can fill in the 'gaps' between what information is provided and what must be assumed.
- Require DETAILED take-offs and quantities for all materials and labor required to construction new science building as per plans provided. provide written description of all assumptions, i.e., 14 concrete footings at 4'x4'x2' per footing.
- Estimate MUST be in the format provided and follow the 16 Division, CSI format.
- Units MUST be US typical--linear feet, (fencing, railings, conduit and wiring, pipe, etc.), square feet (sheathing, concrete paving, painting, GWB, ect.), Cubic Yards (concrete, excavation: cut and fill, etc.), pounds (structural steel), Board feet (wood framing), square feet (light gauge metal framing),
- be sure to separate site work from building scope
- all quantities must be included in estimate. No lump sum costs.
- all sizes must be included (i.e., 3" conduit, #4 THHN Cu Wire, etc.)
- all door types, door sizes, frame types must be broken out separately.
- all interior partitions and exterior wall must be broken out separately.
- all window types and sizes must be broken out separately
- all finishes, accessories, and equipment must be broken out separately.
- all Mechanical equipment, ductwork, registers, etc. must be broken out separately.
- all plumbing fixtures and piping must be broken out separately.
- all electrical panels, sub-panels, conduits and wiring, lighting, switches, outlets, must be broken out separately.
- all fire alarm panels, equipment, wiring, etc. must be broken out separately
- all data and communications equipment, wiring, conduit, etc., must be broken out separately
- Again, be sure to keep all site work and building scope in separate divisions.
- All meeting notes, additions and changes must be accounted for in the estimate.
https://www.dropbox.com/s/w6vlb7govokoz06/Mira%20Loma%20SD%20Sign-off%20Doc%20180508.pdf?dl=0
https://www.dropbox.com/s/4rmh1mnh9olkmdu/MLHS_ScienceBuilding_SD%20Package%20180508r.pdf?dl=0
- PLEASE, If you are not qualified to extrapolate detailed information from a Schematic Design set of document, DO NOT BID ON THIS PROJECT!!!!!
Gerry H.
100% (83)Projects Completed
46
Freelancers worked with
30
Projects awarded
90%
Last project
4 Apr 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies