MEP estimate
- or -
Post a project like this2207
$$
- Posted:
- Proposals: 1
- Remote
- #1932162
- Awarded
Description
Experience Level: Intermediate
Hatem,
Last time we worked together you did a great job on the MEP estimate. This one is VERY different.
THERE IS NO MEP DESIGN--NOTHING.
The project is replacing the Mechanical Units on several buildings at 9 High Schools.
The project is replacing the Mechanical Units on several buildings at 9 High Schools.
All we have to go on are the record drawings of the existing buildings and a 150 page specification and 10 page scoping document which describes the scope of work (in English).
An excellent understanding of English is required for this project)
Can you create a detailed cost estimate using the record sets of the existing buildings and a detailed (verbal) specification and scoping document?
1) the estimate must be a detailed breakdown of the Mechanical, Plumbing and Electrical scope of work.
2) Pricing must be the RS Means 2017 baseline costs for labor and materials (I will adjust costs for the city and general conditions)
3) The project must be complete by March 31.
Please provide your cost/bid for completing this project.
Gerry Hughes
I've attached links of the evaluation and scoping documents.
(as record dwgs are quite extensive. I can upload those if you accept the project.)
https://www.dropbox.com/s/3yepl82yl3ua2zd/Scoping%20Summary_030818.pdf?dl=0
https://www.dropbox.com/s/vdxn6ei7q4b51p8/SJUSD%20HVAC%20Assessment_draft%20020118.pdf?dl=0
Last time we worked together you did a great job on the MEP estimate. This one is VERY different.
THERE IS NO MEP DESIGN--NOTHING.
The project is replacing the Mechanical Units on several buildings at 9 High Schools.
The project is replacing the Mechanical Units on several buildings at 9 High Schools.
All we have to go on are the record drawings of the existing buildings and a 150 page specification and 10 page scoping document which describes the scope of work (in English).
An excellent understanding of English is required for this project)
Can you create a detailed cost estimate using the record sets of the existing buildings and a detailed (verbal) specification and scoping document?
1) the estimate must be a detailed breakdown of the Mechanical, Plumbing and Electrical scope of work.
2) Pricing must be the RS Means 2017 baseline costs for labor and materials (I will adjust costs for the city and general conditions)
3) The project must be complete by March 31.
Please provide your cost/bid for completing this project.
Gerry Hughes
I've attached links of the evaluation and scoping documents.
(as record dwgs are quite extensive. I can upload those if you accept the project.)
https://www.dropbox.com/s/3yepl82yl3ua2zd/Scoping%20Summary_030818.pdf?dl=0
https://www.dropbox.com/s/vdxn6ei7q4b51p8/SJUSD%20HVAC%20Assessment_draft%20020118.pdf?dl=0
Gerry H.
100% (83)Projects Completed
46
Freelancers worked with
30
Projects awarded
90%
Last project
4 Apr 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies