Amtrak Building Maintenance

  • Posted
  • Proposals 1
  • Remote
  • #1009
  • Archived
Michael R. has already sent a proposal.
  • 0

Description

Experience Level: Intermediate
Strip and finsh floors:

The surfaces to be serviced are 2500 and 1650 sq ft. There are two locations involved and the travel distance is 70 miles between sites. The surface is VCT tile. The project may require 2 days because of time delays between chemical applications.

Clarification Board

    There are no clarification messages.