Steel Building Take off (USA, UK, AS Standard) Max weight 75-100 Ton

$60
1
Delivery in
3 days
Response time
Instantly

  • Views 361
  • 1
   
  • 1

What you get with this Hourlie

If you have any Building With Steel Beam, Column, Bracing & Need to Know total weight of the total steel required to construct the building. I can provide you total weight of Steel Required for your project. The Beam/Column/Bracing may be of any standard W section, UB, UC. CHS, SHS, RHS, Angle, PFC Etc. I can calculate the total weight & length required for the whole structure. I will not allow any revision for this job. If your design is changed then have to pay more.
I will provide you a complete Excel Take off List or Pdf. I can do 75 to 100 ton Project only with this rate. But if Project is much complicated then rate will be changed.

What the Seller needs to start the work

Please Send me the following Document:
*Structural drawing of the project in Dwg or Pdf Format
*Drawing must include Floor Beam layout & section or elevation of Steel Member
*Structural 3D If any