Heath safety Project method statement for Roofing

  • Posted:
  • Proposals: 2
  • Remote
  • #100241
  • Awarded
Bella Property Solutions C.
Yan H. have already sent a proposal.
  • 1

Description

Experience Level: Intermediate
Require a health and safety method statement to be prepared for the erection of a dormer to a pitched roof within a terraced house.
Will require to be done within a 2 days max, can supply drawings if required.

New Proposal

Create an account now and send a proposal now to get this project.

Sign up

Clarification Board Ask a Question

    There are no clarification messages.