Reinforced concrete septic tanks to serve a new built apartment of 8 to 10 persons

  • Posted:
  • Proposals: 8
  • Remote
  • #689622
  • Expired
Philip M.Tajudeen Tope M.Imagine Draughting S.Oishi S.Marco T. + 3 others have already sent a proposal.
  • 2

Description

Experience Level: Entry
Design details: REINFORCED CONCRETE SEPTIC TANKS to serve a new built apartment of 8 to 10 persons.
CAD drawings needed, to include plan and sections.

1. Should be rectangular with multiple chambers/compartments

2. Each chamber should have its own separate inspection chamber


3. Inlet chamber to collect all waste from (toilet, sink, basin and bath)

4. Outlet chamber (last chamber) will contain only liquid that will be pumped using submersible pump. Pumping not part of the design


5. Non mechanical filtration system (filter chamber) should be included to ensure outlet chamber contains only liquid.

6. Project is in Ghana. There is no central sewage system

7. Assume bottom level of inlet chamber to be 0mm

8. CAD drawings needed, to include plan and sections
Ideas for the visual style: See web for samples
Extra notes: REINFORCED CONCRETE SEPTIC TANKS to serve a new built apartment of 8 to 10 persons.

1. Should be rectangular with multiple chambers/compartments

2. Each chamber should have its own separate inspection chamber


3. Inlet chamber to collect all waste from (toilet, sink, basin and bath)

4. Outlet chamber (last chamber) will contain only liquid that will be pumped using submersible pump. Pumping not part of the design


5. Non mechanical filtration system (filter chamber) should be included to ensure outlet chamber contains only liquid.

6. Project is in Ghana. There is no central sewage system

7. Assume bottom level of inlet chamber to be 0mm



New Proposal

Create an account now and send a proposal now to get this job.

Sign up

Clarification Board Ask a Question

    There are no clarification messages.