Construction cost estimate: Cloverdale
- or -
Post a project like this2563
$$
- Posted:
- Proposals: 2
- Remote
- #1773916
- Awarded
Description
Experience Level: Intermediate
General information for the business: require detailed construction cost estimate: school modernization
Description of support work: Modernization/new construction at 3 schools. Require detailed cost estimate based on accurate material take-offs for all work described in the drawings. Prices for labor and materials must be based on UNION WAGES in the United States, CALIFORNIA, SAN FRANCISCO.
NOTE: YOU ARE NOT ESTIMATING THE COST OF THE BUILDINGS. The buildings, themselves, are pre-manufactured portable buildings and their cost is fixed and NOT part of the scope. The estimate is just the scope of new work--mostly electrical, fire alarm and data, with some casework, finishes and other minor alterations to the buildings. All NEW utilities, grading, and site work are to be estimated.
The links to the drawings and a sample worksheet and summary sheet are included. Note that each building MUST be on separate worksheet and each school MUST be in a separate file.
The deadline is November 11.
https://www.dropbox.com/s/5c2xu3kcw9hlb59/sample-format.xlsx?dl=0
https://www.dropbox.com/s/y0is29w7nq5hya0/01-112593-Drawings.pdf?dl=0
As always, confidentiality is a must. NDO applies.
Extra notes:
Description of support work: Modernization/new construction at 3 schools. Require detailed cost estimate based on accurate material take-offs for all work described in the drawings. Prices for labor and materials must be based on UNION WAGES in the United States, CALIFORNIA, SAN FRANCISCO.
NOTE: YOU ARE NOT ESTIMATING THE COST OF THE BUILDINGS. The buildings, themselves, are pre-manufactured portable buildings and their cost is fixed and NOT part of the scope. The estimate is just the scope of new work--mostly electrical, fire alarm and data, with some casework, finishes and other minor alterations to the buildings. All NEW utilities, grading, and site work are to be estimated.
The links to the drawings and a sample worksheet and summary sheet are included. Note that each building MUST be on separate worksheet and each school MUST be in a separate file.
The deadline is November 11.
https://www.dropbox.com/s/5c2xu3kcw9hlb59/sample-format.xlsx?dl=0
https://www.dropbox.com/s/y0is29w7nq5hya0/01-112593-Drawings.pdf?dl=0
As always, confidentiality is a must. NDO applies.
Extra notes:
Gerry H.
100% (83)Projects Completed
46
Freelancers worked with
30
Projects awarded
88%
Last project
4 Apr 2024
United Kingdom
New Proposal
Login to your account and send a proposal now to get this project.
Log inClarification Board Ask a Question
-
There are no clarification messages.
We collect cookies to enable the proper functioning and security of our website, and to enhance your experience. By clicking on 'Accept All Cookies', you consent to the use of these cookies. You can change your 'Cookies Settings' at any time. For more information, please read ourCookie Policy
Cookie Settings
Accept All Cookies